Te Mihi Geothermal Power Project

Location
Taupo, New Zealand
Client
McConnell Dowell
Project team size
85
Project duration
12 Months
Lost time injuries

The 2 x 83 MW Te Mihi Geothermal Power Plant is located within the Te Mihi Area of the Wairakei Geothermal Steam-Field. JLE was contracted by MSP JV to install 7000m of primary cable ladder rack, complete the building services installation, install over 200,000m of Low voltage cable and the associated Switchboards, Motor Control Centre and Distribution Boards. The contract also includes installation of Instrumentation including impulse lines and piping bridals. The client has a lot of safety protocols on site including "home without harm, everyone every day" and "look after your mate," which incorporates well with JLEs own safety system ZERO. JLE completed this project with no LTI's or MTI's on site

Read more

Scroll Down
Scroll Down
No items found.
No items found.

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

Related Projects