Location
China
Client
Hebei GN Solids Control
Project team size
3
Project duration
4 months
Lost time injuries

JLE was contracted to provide electrical hazardous area expertise for the construction of eleven drilling rig mud tanks built in China but destined for the High Arctic in PNG. JLE carried out the initial electrical design verification in NZ and then mobilized hazardous area EAHA electricians and inspectors to undertake manufacturing surveillance and hazardous area dossier preparation at Hebei’s factory in China to ensure hazardous area electrical compliance. The tanks were 9-tonne heli lift capable which on arrival in PNG were shipped up by river to the western province of PNG and then heavy-lift helicoptered to site.  JLE completed this project with zero LTIs.  ​

Read more

Scroll Down
Scroll Down
No items found.
No items found.

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

Related Projects