Location
Eltham, Taranaki, New Zealand
Client
Fonterra Brands
Project team size
16
Project duration
12 months
Lost time injuries

JLE Mechanical were consulted to fabricate and install Manual cheese Vats at Fonterra Brands for the Te Roto plant relocation at Bridge Street. This project consumed 3000hours of labour and included electrical installation by JLE Hawera. Vats weighed approximately 1.5 tonne and had to be forklifted 4m up on to a mezzanine floor and then manually moved into position requiring walls to be removed and pipework modified. Vats were polished and inspected for sign off by Assure Quality to meet stringent food safety standards.

Read more

Scroll Down
Scroll Down
No items found.
No items found.

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

Related Projects