Northern Corridor Improvements Project

Location
Auckland, New Zealand
Client
Fulton Hogan
Project team size
10
Project duration
7 months
Lost time injuries

JLE have been privileged to be part of the great Northern Corridor Improvement Programme. The project is to incorporate a bypass network for the Auckland Harbour Bridge in the event of a failing of the crossing. Our part of this project is the illumination of a section of State Highway One Underpass to link with SH18. The Lighting System installation incorporated the use of 152 LED 385w Tube Point Gen2 Lights and 14 LED 148w Emergency Lights , C/W UPS battery powered system, in the event of failure of the main lighting system. In addition to the lighting system, a MCU controlled lighting system was installed to control lighting levels 24 hours a day, for an increased safety and efficient transport system. The finished product is a ‘state of the art’ lighting system that will continue to operate for many years into the future.

Read more

Scroll Down
Scroll Down
No items found.
No items found.

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

Related Projects