Location
Hawera, Taranaki, New Zealand
Client
Fonterra
Project team size
4
Project duration
5 months
Lost time injuries

JLE were engaged to install 9x EV chargers on the Fonterra Whareroa site. This included significant civil management, design support, Electrical underground ducting, Installation of new switchboard and connection of chargers, termination drawings and mechanical support from the JLE Mechanical team.

Read more

The specific charger in this article is a Schneider EVlink 22.1kw unit.

JLE also service and test pre-installed chargers with the use of our certified test equipment.  

Power capacity checks can be carried out to determine if the onsite electrical system can withstand the charging load to ensure that upstream circuit tripping does not occur.  

Scroll Down
Scroll Down
No items found.
No items found.

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

"Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. Minus maxime option. Corporis dicta eaque sequi autem suscipit. Dolores asperiores sunt tempora ipsa pariatur aut consectetur corporis quia. "

NAME - COMPANY NAME

Related Projects